Construction of the
New Bridge over the Virilla River on National Route 32
(Completed)

ABOUT THE PROJECT

The new bridge over the Virilla River on Route 32 is a next-generation infrastructure project with a total intervention length of 856 meters, including both the new bridge and the approach sections at each end (Tibás to the south and Santo Domingo to the north), each measuring approximately 285 meters.

The three-lane bridge is 286 meters long and 14.3 meters wide, and includes a pedestrian walkway. The structure consists of three spans — the side spans measure 78 meters each and the central span measures 130 meters — supported by two 50-meter-high piers. The project was completed in September 2020.

The area where this bridge was built, parallel to the existing structure, is one of the country’s busiest traffic corridors. This project has helped ease daily traffic congestion, especially freight transportation, while increasing vehicular capacity along the intervened section.

UNOPS' ROLE

Project management under a full implementation modality.

UNOPS was responsible for the procurement, auditing, and approval of preliminary studies (topography, geotechnics, hydrology, and Environmental Impact Assessment), support for the relocation of public utilities, development of construction designs, construction execution, and project supervision. In addition, UNOPS supported expropriation management processes and other required procedures, carried out the project’s social management component, and strengthened the capacities of the CONAVI-CABEI Executing Unit.

UNOPSVirilla29Ene24_57.jpg
DJI_20241002103217_0177_D (2).jpg
SDGs TO WHICH IT CONTRIBUTES
Infografía Puente Virilla Ruta 32

The message has been sent successfully

Contact Us
We value your opinion

SIGMA Business Center, Tower B, 2nd Floor, Montes de Oca, San José, Costa Rica.

Tel. 506 4081-0040 ext 1111

E-mail:

costa.rica@unops.org

bottom of page